8D Remote Hands Ticket Checklist

8Dweb Remote Hands Ticket Checklist

Version 4.6 – Effective October 01, 2021

To ensure fast and efficient service, please review the following requirements before submitting a Remote Hands ticket to noc@8dweb.co.


1️⃣ Advance Notice & Arrival Time

  • Submit all tickets at least 24 hours in advance (same-day requests require written approval and may incur rush fees).
  • Allow a minimum of one hour (±) for engineer arrival due to facility security and check-in procedures.
  • Applicable Facilities: Equinix, Digital Realty, QTS, CoreSite, and other Tier III+ datacenters.

2️⃣ Required Ticket Information

  • Facility Access: Name, location, access method (QR code, escort, etc.), contact at facility.
  • Scope of Work: Clear description of all requested tasks (install, patching, testing, etc.).
  • Rack & Equipment: Rack IDs, elevations, equipment models, serials, inbound shipments with tracking.
  • Power Requirements: Feed type (A/B), connector type (C13/C19/L6-30), voltage, and downtime acceptance.
  • Cabling: Type, length, destination ports, and labeling requirements.
  • Materials & Tools: List any cables, rails, or PDUs 8Dweb should provide.

3️⃣ Time Allocation & Contact Availability

  • Specify expected onsite duration (2-hour, 4-hour, or full-day block).
  • Define whether engagement is fixed-time or task-based (billed hourly).
  • Contact Availability: 8Dweb engineers are reachable via WhatsApp while onsite and may accept Telegram communications. All other correspondence must occur through the official ticket system (noc@8dweb.co).

4️⃣ Onsite Conditions & Limitations

  • All work performed under facility rules and security policy.
  • Delays from inaccurate or missing access/shipment data are billable.
  • Previous vendor cabling will not be corrected unless authorized.

5️⃣ Deliverables After Completion

  • Summary report of work performed within 24 hours.
  • Annotated before/after photos.
  • List of issues discovered or deferred.

6️⃣ Best Practices for Clients

  • Provide accurate documentation and manifests at least 24 hours ahead.
  • Ensure all equipment and cables are properly labeled.
  • Have PDUs, power cords, and rails available onsite.
  • Maintain real-time communication availability during the visit.
  • Plan for 60–90 minutes of facility entry and security processing.

8Dweb Responsibilities: Engineers will arrive on time, perform the approved scope, communicate updates clearly, and document all work with photos and notes.

© 8Dweb LLC – Remote Hands Policy v4.6 (Effective October 01, 2021)

  • Policies, Remote Hands
  • 0 Usuários acharam útil
Esta resposta lhe foi útil?

Artigos Relacionados

8Dweb Terms of Service

Versioning Information Version: 6.0Original Effective Date: January 1, 2009Last Revision Date:...

8Dweb Acceptable Use Policy (AUP)

Acceptable Use Policy (AUP) Version: 8Original Version Date: December 1, 2008Current Version...

8Dweb Privacy Policy

Privacy Policy Version: 4.0Original Effective Date: 04/01/2020Last Updated: 01/01/2025 1....

8Dweb Reseller Policy

  8Dweb LLC Reseller Agreement (2025 Revision) Company: 8Dweb LLC  |  Address: 12902...